BandungHealth & Safety at WorkHSEMaret 2019Technical, Mechanical & Engineering

LOTO (Lockout Tagout) for Power Plant

Jadwal Training LOTO (Lockout Tagout) for Power Plant:

    DESCRIPTION

    Workers performing service or maintenance on machinery and equipment may be exposed to injuries from the unexpected energization, startup of the machinery or equipment, or release of stored energy in the equipment.

    The Lockout/Tagout standard requires the adoption and implementation of practices and procedures to shut down equipment, isolate it from its energy source(s) and prevent the release of potentially hazardous energy while maintenance and servicing activities are being performed. It contains minimum performance requirements, and definitive criteria for establishing an effective program for the control of hazardous energy. However, employers have the flexibility to develop lockout/tagout programs that are suitable for their respective facilities.

    This tutorial summarizes for you the key components of the standard in a question/answer format. This tutorial is intended to guide the user in understanding aspects of the Lockout/Tagout standard. It is not to substitute for compliance with the plain terms of the standard. Nothing in this tutorial is intended to diminish or otherwise affect OSHA’s authority to the OSH Act, nor is it intended to create any legally enforceable right or benefit in any person.

     

    MATERI Training LOTO (Lockout Tagout) for Power Plant

    1. Overview
    2. Scope and Application
    3. Purpose
    4. Definitions
    5. Energy Control Program
    6. Energy Control Procedures – Documentation
    7. Energy Control Procedures – Required Content
    8. Periodic Inspection
    9. Employee Training and Communication
    10. Additional Training (Tagout System)
    11. Employee Retraining
    12. Lockout/Tagout
    13. New or Modified Equipment
    14. Full Employee Protection
    15. Materials and Hardware
    16. Application of Energy Control
    17. Release from Lockout/Tagout
    18. Testing of Machines
    19. Outside Personnel (Contractors)
    20. Group Lockout/Tagout Requirements
    21. Shift and Personnel Changes

     

    TRAINING METHOD

    Presentation

    Discussion

    Case Study

    Evaluation

     

    FACILITIES

    Training Kit

    Handout

    Certificate

    Lunch + 2x Coffee Breaks

    Souvenir

    Pick Up Participant (Yogyakarta)

     

    TRAINING FEE for LOTO (Lockout Tagout) for Power Plant

    Rp7.000.000,-/Participant/Non Residential

    Minimal 3 participant runing

    Form Pre-Registrasi

    Data Materi Training

    Topik Training : LOTO (Lockout Tagout) for Power Plant
    Link
    *Jumlah Peserta Estimasi Jumlah Peserta yang di ajukan
    *Nama Peserta Yang Didaftarkan

    Personal Data

    *Nama
    *Jabatan Jabatan/Divisi/Departement
    *Nama Perusahaan
    *Alamat Perusahaan
    *Email Perusahaan
    *Email Alternatif eg: gmail, yahoo, hotmail
    *Telepon Kantor
    Ekstensi
    *Handphone
    * Harus di isi
    Tags
    , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

    Related Articles

    Check Also

    Close
    *Semua Silabus dan jadwal training yang ada di Training SDM adalah milik dari masing-masing vendor penyelenggara training.
    Close