Lockout/Tagout (LOTO) For Power Plant Operations & Maintenance

Lockout/Tagout (LOTO) For Power Plant Operations & Maintenance

November 19, 2026

Jadwal Pelatihan Lockout/Tagout (LOTO) For Power Plant Operations & Maintenance

TanggalTempatKota
21 - 22 Desember 2026-Bandung

Lockout/Tagout (LOTO) For Power Plant Operations & Maintenance

 

DESKRIPSI

Lockout/Tagout (LOTO) merupakan prosedur keselamatan kerja yang bertujuan untuk mengendalikan sumber energi berbahaya selama kegiatan pemeliharaan, perbaikan, pemeriksaan, maupun pekerjaan pada peralatan industri. Pada industri pembangkit listrik, penerapan LOTO memiliki peran penting mengingat adanya berbagai sumber energi berbahaya, seperti energi listrik, mekanis, termal, fluida bertekanan, serta energi tersimpan.

Pelatihan ini membahas prinsip dan ketentuan LOTO, identifikasi sumber energi berbahaya pada peralatan pembangkit, pembagian peran dan tanggung jawab personel operasi maupun pemeliharaan, penggunaan perangkat Lockout/Tagout, serta tahapan pelaksanaan isolasi energi.

 

TUJUAN PELATIHAN

Setelah mengikuti pelatihan ini, peserta diharapkan mampu:

  1. Memahami prinsip dasar Lockout/Tagout dan peraturan keselamatan terkait pengendalian energi berbahaya.

  2. Mengidentifikasi berbagai sumber energi berbahaya pada peralatan dan sistem pembangkit listrik.

  3. Memahami peran dan tanggung jawab personel operasi serta pemeliharaan dalam penerapan prosedur LOTO.

  4. Menggunakan perangkat Lockout/Tagout sesuai dengan jenis sumber energi dan peralatan yang diisolasi.

  5. Melaksanakan tahapan isolasi energi hingga verifikasi kondisi Zero Energy State.

  6. Memahami prosedur Group LOTO, serah terima penguncian, dan penanganan pelepasan kunci dalam kondisi darurat.

  7. Melakukan dokumentasi dan simulasi penerapan LOTO menggunakan prosedur Permit to Work (PTW) dan LOTO Logbook.

 

MATERI Training Lockout/Tagout (LOTO) For Power Plant Operations & Maintenance

1. Introduction to LOTO & Regulations

  • Control of Hazardous Energy principles

  • OSHA 1910.147 standards and national safety regulations

  • Legal and financial impacts of LOTO failures

2. Power Plant Hazardous Energy Mapping

  • Thermal & Fluid: High-pressure steam (Main Steam), boiler feed water, flue gas

  • Mechanical & Kinetic: Coal feeders, pulverizers/mills, draft fans (PA/FD/ID), turbines

  • Electrical: MV/LV switchgears, 6kV/380V motors, DC battery systems

  • Stored Energy: Capacitors, hydraulic accumulators, spring-loaded actuators

3. Roles & Responsibilities in LOTO

  • Operation (Authorized Person): Asset owners, executing physical isolation, applying Master Locks, and testing Zero Energy State

  • Maintenance (Affected Person): Work executors, applying Personal Locks, and field verification

  • DCS & Field Communication: Radio protocols during isolation checks

4. LOTO Hardware & Color Coding

  • Lockout padlocks and color-coding standards (Ops vs. Maint)

  • Lockout devices: Hasps, valve lockouts (gate, ball, butterfly), and circuit breaker lockouts

  • Tagging procedures: Danger Tags and Out-of-Service Tags

5. The 6 Golden Steps of LOTO

  • Preparation: Creating Isolation Lists and Work Permit coordination

  • Shutdown: Turning off equipment per Standard Operating Procedures (SOP)

  • Isolation: Closing valves and racking out circuit breakers

  • Application: Installing locks and tags

  • Stored Energy Control: Draining, venting, and grounding

  • Verification: Testing local/DCS starts to confirm a Zero Energy State

6. Special Procedures & Complex Scenarios

  • Group LOTO: Using Lock Boxes for large-scale maintenance (Overhauls/Outages)

  • Shift Handover: Transferring LOTO locks between shifts (Ops to Ops, Maint to Maint)

  • Emergency Lock Removal: Protocol for cutting locks if a technician leaves the site

Form Pre-Registrasi

Data Materi Training

Topik Training : Lockout/Tagout (LOTO) For Power Plant Operations & Maintenance
Link
*Jumlah Peserta
*Nama Peserta Yang Didaftarkan

Personal Data

*Nama
*Jabatan
*Nama Perusahaan
*Alamat Perusahaan
*Email Perusahaan
*Email Alternatif
*Telepon Kantor
Ekstensi
*Handphone
* Harus di isi

Silahkan isi form berikut sebelum melakukan chat