TAG: Defining boundary system to be assessed
Risk Based Inspection
June 30, 2025
DESCRIPTION Inspeksi Berbasis Risiko (Risk-Based Inspection/RBI) adalah suatu proses sistematis yang mengidentifikasi, menilai, dan memetakan risiko industri yang dapat membahayakan integritas peralatan, baik pada
Risk Based Inspection
June 20, 2025
DESCRIPTION Risk-Based Inspection is a systematical process that identifies, assesses and map industrial risks, which can compromise equipment integrity in both pressurized equipment and structural elements. The high
Plant Inspection Based on Risk
August 12, 2016
Instructur by : Bambang Murtjahjanto OUTLINE Defining boundary system to be assessed Screening operating unit within a plant to identify area of high risk. Identifying the damage mechanism operative Determining