BandungDesember 2013Februari 2014November 2013Technical, Mechanical & Engineering

Technical Drawing Piping and Instrumentation Design


    Instructor by : DR. Ir. Halim Abdurachim

     

    PURPOSE

    • Understand process control devices and the symbols used to define them
    • Define and specify vendor criteria for the production of plant documentation to the order of the company
    • Be familiar with the use of specifications to control the design scope of the project
    • Understand the purpose of a HAZOP in the development of a plant
    • Be in a position to implement and manage plant modifications from conception to completion
    • Be aware of the ISA standard available to assist you in developing and understanding instrument and control documents 

     

    PARTICIPANTS

    Instrumentation and Control Engineers & Technicians, Electrical Engineers, ,Project Engineers, Telecommunications Engineers & Technicians, Process Control Engineers, Consulting Engineers, Maintenance Engineers & Technicians, Production Controllers, Project Managers, Electricians, 

     

    COURSE OUTLINE

    INTRODUCTION

    • Standards and Regulations (ANSI, ASME, ASTM, API, CSA, ISA, OSHA)
    • Drawings in Project Lifecycle
    • Document Control 

    PIPING AND INSTRUMENTATION DIAGRAMS

    • Piping and Instrumentation Diagram (P&ID)
    • P&ID Symbols
    • Line Numbering  ; Valve Numbering
    • Equipment Identification
    • Abbreviations 

    INTERPRETING P&IDs – VALVES

    • Valve Types  ;  Valve Identification;  Valve Fittings 

    INTERPRETING P&IDs – EQUIPMENT

    • Vessels  ; Pumps  ; Heat Exchangers
    • Compressors
    • Equipment Identification   

    INTERPRETING P&IDs – CONTROL & SAFETY SYSTEMS

    • Distributed Control Systems (DCS)
    • Safety Instrument System (SIS)
    • Instrument Symbols
    • Instrument Signal Lines
    • Pressure Instruments
    • Temperature Instruments
    • Flow Instruments 

    DETAILED ENGINEERING DRAWINGS

    • Plot Plan
    • Electrical Area Classification
    • Piping Drawing
    • Isometric
    • Material Take Off
    • Line List  ; Tie-in List
    • Shutdown Key 

    ENGINEERING DRAWINGS FOR CONSTRUCTION AND OPERATION

    • Developing As-Builds
    • Preparing for a PHA (HAZOP, What-If, etc)
    • Management of Change (MOC) 

     

    TRAINING METHOD

    Presentation

    Discussion

    Case Study

    Evaluation 

     

    TRAINING FEE for Technical Drawing Piping and Instrumentation Design

    Rp 7.000.000,- / participant / Non residential

     

    FACILITIES

    Training Kit

    Handout

    Certificate

    1 x Lunch

    2 X Coffee Break

    Souvenir

     

    Form Pre-Registrasi

    Data Materi Training

    Topik Training : Technical Drawing Piping and Instrumentation Design
    Link
    *Jumlah Peserta Estimasi Jumlah Peserta yang di ajukan
    *Nama Peserta Yang Didaftarkan

    Personal Data

    *Nama
    *Jabatan Jabatan/Divisi/Departement
    *Nama Perusahaan
    *Alamat Perusahaan
    *Email Perusahaan
    *Email Alternatif eg: gmail, yahoo, hotmail
    *Telepon Kantor
    Ekstensi
    *Handphone
    * Harus di isi
    Tags
    , , , , , , , , , , ,

    Related Articles

    *Semua Silabus dan jadwal training yang ada di Training SDM adalah milik dari masing-masing vendor penyelenggara training.
    Close