Desember 2015November 2015Supply Chain, Logistics & TransportationTechnical, Mechanical & EngineeringYogyakarta

Introduction To Integrated Upstream Material Management

Jadwal Training Introduction To Integrated Upstream Material Management:

    Instructor by : Isnu Hartoko 

     

    OBJECTIVES

    After completing this course the participant has a better knowledge on drilling and production material specification and management especially for non technical personnel and supporting staffs

     

    MATERI

    1. Overview of drilling material classification Specification

    • Specification and characteristic of drilling Equipment and instrumentation.
    • Drilling Fluids and additive material for drilling support operation

    2. Overview Of Production Material Specification

    • Sub Surface Equipment Classification and specification surfaces equipment classification & Specification
    • Instrumentation and Technology support
    • Chemical and additive material requirement in production operation

    3. Introduction to Metal Material For Drilling and Production Operation

    • Classification of Metallurgy
    • Classification of Metal Commercially
    • Metal as Construction Material
    • Metal Properties and its consideration
    • Corrosion mechanism and prevention Techniques

    4. Overwiew Inventory and Stock Control Management for drilling operation

    • Integration of Inventory & scm
    • Understanding Inventory Key Concepts
    • Inventory Replenishment methods & system
    • Stock control coding, re-coding & checking
    • Models for implementing inventory control

    5. Material Requirement planning in Drilling Operation

    • Logistic needs in drilling operation
    • Schedule Of Drilling and Material Requirement Planning
    • Dependent and independent materials
    • MRP Process and its role in drilling operation
    • Scheduled and panned order release
    • Planned order receipt

     

    PESERTA

    • Secretary and Admin for drilling and Operation
    • Public relations staffs
    • External relations staffs
    • HR personnel
    • General Affairs
    • Legal & Contract
    • Admin and Secretary SCM and Procurement Staffs
    • Inventory and Stock Control
    • Warehousing Staffs
    • Project Economic
    • Project Engineers
    • Finance and Accounting
    • Operational Audit
    • Petroleum Engineers
    • Field Engineers
    • Dll

     

    TRAINING METHOD

    Presentation

    Discussion

    Case Study

    Evaluation

     

    FACILITIES

    Training Kit

    Handout

    Certificate

    Lunch + 2 X Coffee Break

    Souvenir

    Pick Up Participant

     

    TRAINING FEE for Introduction To Integrated Upstream Material Management

    Rp 7.000.000,- / participant / Non residential

    Minimal 3 orang peserta

    Form Pre-Registrasi

    Data Materi Training

    Topik Training : Introduction To Integrated Upstream Material Management
    Link
    *Jumlah Peserta Estimasi Jumlah Peserta yang di ajukan
    *Nama Peserta Yang Didaftarkan

    Personal Data

    *Nama
    *Jabatan Jabatan/Divisi/Departement
    *Nama Perusahaan
    *Alamat Perusahaan
    *Email Perusahaan
    *Email Alternatif eg: gmail, yahoo, hotmail
    *Telepon Kantor
    Ekstensi
    *Handphone
    * Harus di isi
    Tags
    , , , , , , , , , , , , , ,

    Related Articles

    Check Also

    Close
    *Semua Silabus dan jadwal training yang ada di Training SDM adalah milik dari masing-masing vendor penyelenggara training.
    Close