Electric Submersible Pump : Principles, Installation, Operation, Maintenance and Troubleshooting

Electric Submersible Pump : Principles, Installation, Operation, Maintenance and Troubleshooting

January 7, 2014

Jadwal Pelatihan Electric Submersible Pump : Principles, Installation, Operation, Maintenance and Troubleshooting

TanggalTempatKota
Belum ada jadwal terbaru

Instructor by : Imam Sujanmo

5-7 Mei 2014, Jogjakarta Plaza Hotel, Yogyakarta

21 – 24 April 2014, Jogjakarta Plaza Hotel – Yogyakarta

(4 Hari Kerja 2014, Jogjakarta Plaza Hotel, Yogyakarta)

21 – 23 Oktober 2013, Jogjakarta Plaza Hotel – Yogyakarta

 

INTRODUCTION

Electrical Submergible Pump (ESP) merupakan salah satu teknik Artificial Lift yang saat ini paling banyak dipergunakan untuk mengangkat fluda reservoir ke permukaan.  Dengan semakin sedikitnya persediaan gas di lapangan, maka kebutuhan pemasangan ESP pada sumur –  sumur untuk menggantikan Gaslift system semakin meningkat, maka operation personel memerlukan pengetahuan yang jelas tentang aspek-aspek operasi, pemilihan dan troubleshooting ESP.

Pelatihan ini untuk memberi bekal kepada para peserta untuk dapat  meningkatkan kemampuan dalam mengoperasikan, perencanaan, dan kontrak ESP agar dapat melaksanakan tugasnya dengan secara maksimal dan efisien. 

 

MATERI Training Electric Submersible Pump : Principles, Installation, Operation, Maintenance and Troubleshooting OUTLINE

I.     Hydraulic & Electrical Fundamentals

  • Introduction
  • Hydraulic Fundamentals
  • Centrifugal Pump Hydraulics
  • Well Performance
  • Electricity Fundamentals

II.    Equipment Description

  • Introduction
  • Centrifugal Pump
  • Rotary Gas Separator
  • Seal Section
  • Electrical Submersible Motor
  • Generalized Motor Composite Curves
  • Motor Controllers
  • VSC Effects on ESP Components
  • Down hole Pressure and Temperature Monitors
  • Transformers
  • Junction Box
  • Wellhead
  • Check Valve
  • Drain Valve
  • Backspin relay
  • Centralizer
  • Cable
  • Cable Bands
  • Motor Lead Extension

III.   Typical ESP Applications

  • Introduction
  • Shrouded Configuration
  • Booster Pump
  • Direct Production-Injection-System
  • Horizontal Injection System
  • Cantle slopeâ Injection System
  • ESP Installation with Deep Set Packer
  • ESP Installation with “Y” Tool
  • Bottom Intake Booster Pump
  • Operation of Submersible Pumps in Harsh Environments

IV.   Equipment Sizing

  • Introduction
  • Basic Data Required
  • Sizing Procedure High-Water-Cut
  • Sizing example : High-Water-Cut
  • Effect of Viscosity on Centrifugal Pump Performance
  • Sizing Procedure for Viscous Fluids
  • Sizing Example: Viscous Fluids
  • Sizing Procedure High GOR
  • Sizing Example High GOR
  • Sizing Procedure Variable Speed
  • Sizing Example: Variable Speed

V.    Installation Maintenance and Trouble shooting

  • Introduction
  • Equipment Transportation
  • Equipment Handling
  • Well Preparation
  • Installation of Down hole Equipment
  • Installation of Surface Equipment
  • Starting  ESP
  • Testing
  • Data Gathering
  • Re-running Equipment
  • Economic Evaluation
  • Failure Analysis
  • Ammeter Technology
  • Field Checkout
  • ESP Troubleshooting Chart

VI.  Engineering Data

  • Electrical Terms and Definition
  • Useful Formulas
  • Relationships Regarding Flow and Pressure drops in Pipes
  • Temperature Rise in Pumps
  • Measurement for Water Flow
  • Areas of Circles
  • Conversion Factors
  • Temperature Conversion Table
  • Fundamental Unit of Length, Area, Volume and Mass
  • Conversion Factors For Units of Energy
  • Casing and Tubing Sized and Capacities
  • Stretch of  Suspended Casing, Tubing or Drill Pipe
  • Tubing Weight in Fluid
  • Hydrostatic Head
  • Well Temperature versus Current
  • Absolute Viscosity of Gas-Free Crude Oil, Centipoises
  • Absolute Viscosity of Gas-Saturated Crude Oil, Centipoises
  • Pressure Loss Charts
  • Flow Loss due to Friction in API. Pipe (U.S)
  • Inflow Performance relationship Equations

VII. Installation, Operating And Troubleshooting The Pump

VIII.Cases study and discussion

 

PARTICIPANT

Production Engineer, Supervisor, dan staff/operator  bagian produksi, serta siapa saja yang ingin lebih memperdalam Desain dan Operasi ESP

 

TRAINING METHOD

Presentation, Discussion, Case Study, Evaluation

 

TRAINING FEE for Electric Submersible Pump : Principles, Installation, Operation, Maintenance and Troubleshooting

Rp9.500.000,- / participant / Non residential

(Quota minimal 5 orang peserta) 

 

FACILITIES

Training Kit, Flash disk, Handout, Certificate,  Lunch, 2 X Coffee Break, Souvenir, Pick up Participant (Yogyakarta)

 

Form Pre-Registrasi

Data Materi Training

Topik Training : Electric Submersible Pump : Principles, Installation, Operation, Maintenance and Troubleshooting
Link
*Jumlah Peserta
*Nama Peserta Yang Didaftarkan

Personal Data

*Nama
*Jabatan
*Nama Perusahaan
*Alamat Perusahaan
*Email Perusahaan
*Email Alternatif
*Telepon Kantor
Ekstensi
*Handphone
* Harus di isi